How the quadratic score rates a probability forecast
It keeps two lists of integer weights, turns them into reduced ratios, and scores one labeled event with the quadratic penalty. The gap between the quotes is the squared Euclidean distance of those ratios.
The result appears here when the page script runs.
How it is computed
Method
Let the quote weights be w and their sum W, and the truth weights v with sum V. The quoted probability of label j is the reduced ratio w_j/W. For an outcome i the quadratic penalty is the sum of squared gaps between the indicator and those probabilities, kept as one reduced ratio. The positively oriented reward is the negative of that penalty. The gap between the two quotes is the sum of squared differences of their probabilities. The expected penalty of the quote, when the truth is the distribution of the expectation, equals the truth's own expected penalty plus that gap.
Assumptions
The labels are mutually exclusive and they exhaust the list that was typed. A weight is an integer input, not a frequency estimated from a sample. The truth list is the distribution the expectation uses. It is not an observed base rate. The logarithmic score is not computed. One labeled event is not a calibration curve.
Limits
The page does not recommend an action and is not a forecasting record. The bounds keep every squared numerator inside a safe integer: 2 to 5 labels, weights 0 to 200, and at least one positive weight on each list.
Reproducibility
The inputs are kept in the address bar, so the same link reruns the same calculation. The same integers produce the same reduced ratios in this engine.