Lead time, landed cost, and the reorder point for one shipment

Logistics

I am Vice President of an import and distribution business, so the routing question is familiar territory. This page covers what happens before the route: what a unit costs once it lands and when to reorder it. The routing lab is a separate page.

One basis point is one hundredth of one percent. A weight is a count in the fixture, not a shipment. The service fraction must be at most 1. The sweep draws at most 24 points.

The result appears here when the page script runs.

How it is computed

Landed unit cost

Let U be the unit cost, F the freight, and O the other adder, each an integer number of fixture cents. Let b be the duty in basis points, an integer from 0 to 10000. The landed cost in cents is the reduced form of (U + F + O) times 10000, plus U times b, over 10000. There is no rounding step. A remainder stays in the ratio.

Duty sensitivity

The difference of landed cost at b+1 and at b is U/10000 cents per basis point, again as a reduced ratio. Freight and the other adder have slope 1. The sweep replaces b with an arithmetic sequence and recomputes the same ratio at each point. Bar height on the chart is only a pixel scale of the quotient. The table is the result.

Reorder point

Daily demand d is a positive integer and does not vary inside the fixture. Lead time is a discrete distribution: day L with positive integer weight w. Duplicate days are added before the sort. The mean lead is the reduced ratio of the sum of L times w, over the sum of w. Demand during a lead of L days is d times L, exact. The service fraction p/q must satisfy p at most q. Walking the days in order, the service day is the first L whose cumulative weight W meets W times q at least p times the total weight. The reorder point is d times that L. Safety stock is that integer minus the mean demand during lead time, as a ratio. It can be negative when the service day sits below the mean. A negative safety stock is a comparison, not an order.

Schema, bounds, and abstention

Unit cents run from 1 to 100000000. Freight and the other adder run from 0 to the same cap. Duty runs from 0 to 10000 basis points. Daily demand runs from 1 to 10000. Each lead day runs from 1 to 365, each weight from 1 to 10000, and the list holds 1 to 12 masses. The sweep holds 1 to 24 points. A service fraction above 1 is rejected, so the walk always meets a day when the other checks pass. Equal frequencies are not a concept on this page. A zero demand is rejected rather than called a reorder of nothing. Products that would leave the safe integer range abort.

What this is not

This page does not place a purchase, name a supplier, or read a document from a business. It does not chart a sale, a volume, a route, or a trade. The inputs are kept in the address bar, so the same link reruns the same calculation.